Results 1 to 2 of 2

Thread: Op/Spell Outcome Probability

Hybrid View

Previous Post Previous Post   Next Post Next Post
  1. #1
    Post Fiend
    Join Date
    Apr 2011
    Location
    Alaska USA
    Posts
    210

    Op/Spell Outcome Probability

    I was going to post this in Thief Op/Spell Quality of life thread... But it didnt quite match the subject of that thread.

    I was thinking of something along the lines of integrating the espionage page info to ops and spells "probable prediction"

    I mean we already have SOT for military and population #'s / SoS for bonuses / Survey for WT % / Infiltrate for Thief to Wizzard population

    Now what I am proposing is not a flat out guarantee of anything (even with full current data)

    But given that we have a shared intel page in esionage, using that page to incorporate into our provincial op/spell pages.

    But as I was getting to... Even with all current data give a NARROWER range of success AND outcome.

    Make it so that we have to set target prov first to change the target variables.

    After selecting target give a success range and outcome range for ops/spells

    Such as X-X% to cause Y-Y Outcome

    The older, more incomplete, or accuracy of the data, the wider the range of success rate or outcome of said op/spell.

  2. #2
    Postaholic
    Join Date
    Jul 2011
    Posts
    811
    Quote Originally Posted by BoBDuDe View Post
    I was going to post this in Thief Op/Spell Quality of life thread... But it didnt quite match the subject of that thread.

    I was thinking of something along the lines of integrating the espionage page info to ops and spells "probable prediction"

    I mean we already have SOT for military and population #'s / SoS for bonuses / Survey for WT % / Infiltrate for Thief to Wizzard population

    Now what I am proposing is not a flat out guarantee of anything (even with full current data)

    But given that we have a shared intel page in esionage, using that page to incorporate into our provincial op/spell pages.

    But as I was getting to... Even with all current data give a NARROWER range of success AND outcome.

    Make it so that we have to set target prov first to change the target variables.

    After selecting target give a success range and outcome range for ops/spells

    Such as X-X% to cause Y-Y Outcome

    The older, more incomplete, or accuracy of the data, the wider the range of success rate or outcome of said op/spell.
    If something like that were possible to do.. that would be fantastic. Integrate the formulas right onto the ops page. If devs don't do it, Munk should! .donate

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •